One tank built so far in 2018 using concrete rings instead of an IBC tank to contain the vermicomposting ecosystem and a water-based reed bed treatment system instead of the greenfilter bed. We are in Tulikup, Gianyar, Bali, Indonesia. People can visit. They can contact through whatsapp number +628123644446. We are now building a second […]
You are browsing archives for
Category: Projects and case studies
Pai das Donas, Arganil, Portugal
The first vermicomposting flush toilet system to be installed by the Câmara Municipal of Arganil was commissioned in July 2016. It was installed to replace a failing septic tank for a 2-person household in the village of Pai das Donas in the freguesia of Benfeita.
Quinta do Vale, Arganil, Portugal
The successful installation of a vermicomposting flush toilet at Quinta do Vale in 2014 was the project which started the whole thing off. This was the initial modification of Anna Edey’s design by Wendy Howard which eventually led to the open sourcing of the design and the development of this website.
Case studies
Have you constructed and installed a vermicomposting flush toilet yourself? If so, we would love to hear from you and feature your project here so others can benefit from your experience. Please read on for more details.